log [2022/06/15 10:08] – [10th Meeting (2022-05-19)] team2log [2022/06/15 11:10] (current) – [13th Week Report (2022-06-02 to 2022-06-09)] team2
Line 15: Line 15:
 //In marketing we developed our problem statement and elevator pitch. Moreover, we started with our WBS in project management. During the technical class we discussed the Blackbox diagrams of each groups.// //In marketing we developed our problem statement and elevator pitch. Moreover, we started with our WBS in project management. During the technical class we discussed the Blackbox diagrams of each groups.//
  
-==== 9th Week Report (2022-04-21 to 2022-04-27)====+==== 5th Week Report (2022-04-01 to 2022-04-07)==== 
 +//Worked on the blackbox diagram, logo design and the state of the art.// 
 + 
 +==== 6th Week Report (2022-04-08 to 2022-04-13)==== 
 +//Choose the materials for the prototype and the product. Mock-ups for the website// 
 + 
 +==== 7th Week Report (2022-04-14 to 2022-04-21)==== 
 +//Preperation for the interim presentation. Finalize the logo design and state of the art.// 
 + 
 + 
 +==== 8th Week Report (2022-04-21 to 2022-04-27)====
 //After the interim presentation we started to correct our work based on the feedback we got. We also finalised the list of materials and worked on the 3D-model of our structure. In the same time, we kept improving other sections such as marketing and project management.// //After the interim presentation we started to correct our work based on the feedback we got. We also finalised the list of materials and worked on the 3D-model of our structure. In the same time, we kept improving other sections such as marketing and project management.//
 +
 +==== 9th Week Report (2022-04-28 to 2022-05-12)====
 +//New ideas about the product design. Update schematic and various chapters in the report.//
 +
 +==== 10th Week Report (2022-05-12 to 2022-05-19)====
 +//Build a new Product design. Work on marketing and sustainability chapters. Development of the website.//
 +
 +==== 11th Week Report (2022-05-20 to 2022-05-26)====
 +//Continue work on the website. Stresstest the product. Continue work on sustainability and marketing. //
 +
 +==== 12th Week Report (2022-05-27 to 2022-06-02)====
 +//Update the 3D-Model and rendering. Build the schematic of the prototype.//
 +
 +==== 13th Week Report (2022-06-02 to 2022-06-09)====
 +//Finalize the website development. Implement the Sensor data into changes on the Screen. Update report chapters according to feedback and start to work on the paper.//
 +
 +==== 14th Week Report (2022-06-10 to 2022-06-15)====
 +//Finish work on the first chapters of the paper. Continue work on the Prototype. Update the leaflet and the poster. //
 ===== Meetings ===== ===== Meetings =====
  
Line 106: Line 134:
  
 === Minute: === === Minute: ===
 +Julka led the meeting. First look at the 3D-Model. Feedback on the interim report.
 ==== 9th Meeting  (2022-05-12) ==== ==== 9th Meeting  (2022-05-12) ====
  
Line 149: Line 177:
  
 === Minute: === === Minute: ===
 +Eliott led the meeting. Feedback on the new 3D-Model. Talks about the schematic of the prototype and possibilities of packaging.
 ==== 13th Meeting  (2022-06-09) ==== ==== 13th Meeting  (2022-06-09) ====
  
Line 159: Line 187:
  
 === Minute: === === Minute: ===
 +Jan led the meeting. Feedback on the physical stresstest and update on the electronics.
 ==== 14th Meeting  (2022-06-15) ==== ==== 14th Meeting  (2022-06-15) ====
  
Line 170: Line 198:
  
 === Minute: === === Minute: ===
 +Carla led the meeting. Showed the new cardboard model and packaging. Progress with the prototype. 