 ** Risk assessment** - Evaluation of risks, depends on the risk preference of the decision maker. As a risk-neutral company, our decisions are based primarily on expected values. ** Risk assessment** - Evaluation of risks, depends on the risk preference of the decision maker. As a risk-neutral company, our decisions are based primarily on expected values.
  
 +
 +**Risk management** - Development of strategies to manage risk. The measures can be preventive or corrective. The following risk strategies are distinguished: risk avoidance, risk reduction, risk transfer, risk assumption.
 +
 +**Risk monitoring** - Review of the planned measures and their effect as well as the further development of risks.
 +The individual processes do not represent completed procedures, but must be monitored regularly and re-evaluated when new information about a risk is available.
 The following tables are identified risks regarding to the project and product. The following tables are identified risks regarding to the project and product.
  
Line 555: Line 560:
 </WRAP> </WRAP>
  
- 
-**Risk management** - Development of strategies to manage risk. The measures can be preventive or corrective. The following risk strategies are distinguished: risk avoidance, risk reduction, risk transfer, risk assumption. 
- 
-**Risk monitoring** - Review of the planned measures and their effect as well as the further development of risks. 
-The individual processes do not represent completed procedures, but must be monitored regularly and re-evaluated when new information about a risk is available. 
  
 The biggest challenge of a project is that due to existing risks a project’s success can be achieved completely, partially or not at all.  The biggest challenge of a project is that due to existing risks a project’s success can be achieved completely, partially or not at all. 
Line 578: Line 578:
 The last external stakeholders identified are the suppliers. Their importance is great because the manufacturing of the product relie almost them. From the raw materials, to the shaping of parts,  but also the transportation, all these cannot be fully carried out as explained in the previous section 3.8 procurement. Therefore, it would be detrimental to not maintain good relationship with them. But on the other hand, since we are so dependant on them, it is necessary to monitor them closely. Thus, contrats must clarify precisely needs and expectation as well as what should happen if not respected (delays, etc).  The last external stakeholders identified are the suppliers. Their importance is great because the manufacturing of the product relie almost them. From the raw materials, to the shaping of parts,  but also the transportation, all these cannot be fully carried out as explained in the previous section 3.8 procurement. Therefore, it would be detrimental to not maintain good relationship with them. But on the other hand, since we are so dependant on them, it is necessary to monitor them closely. Thus, contrats must clarify precisely needs and expectation as well as what should happen if not respected (delays, etc). 
 ==== - Sprint Outcomes ==== ==== - Sprint Outcomes ====
-//To be added. Include the outcomes of all sprint reviews (what was the sprint backlog, completion status, planned capacity vs. achieved velocity).//+The following tables show the weekly sprints, indicating the taskthe completion status and the person in charge. In additionthe planned working hours are compared with the actual workload.
  
 <WRAP center centeralign 750px> <WRAP center centeralign 750px>
Line 1523: Line 1523:
 **Performance test** **Performance test**
  
-The technological performance of software was assessed using the Google Developers service [[https://pagespeed.web.dev|Page Speed Insights]], which sends a request to the page and measures response and load times. The performance scores of the mobile and screen applications were both high with 90 and 92 percent respectively (see figures {{ref>figlabel41}} and {{ref>figlabel42}}). The small reduction in performance scores is due to the large data size of the 3D plugin. +The technological performance of software was assessed using the Google Developers service [[https://pagespeed.web.dev|Page Speed Insights]], which sends a request to the page and measures response and load times. The performance scores of the mobile and screen applications were both high with 90 and 92 percent respectively (see Table {{ref>tlabel29}}). The small reduction in performance scores is due to the large data size of the 3D plugin. 
  
  
- +<WRAP center centeralign 750px> 
-<figure figlabel41> +<table tlabel29
-{{ ::performance-mobile.png?600 |{{ :performance-screen.png?600 |}} +<caption>Page Speed Performance Test Results</caption> 
-<caption>Performance result mobile application</caption> +^ Performance Indicator ^ Screen Application ^ Mobile Application ^  
-</figure>  +| Overall Score | 92 | 90 |  
-<figure figlabel42> +| First Contentful Paint | 0.7s | 0.7s |  
-{{ :performance-screen.png?600 |}} +| Time to Interactive | 1.4s | 1.5s | 
-<caption>Performance result screen application</caption+| Speed Index | 1.0s | 1.1s |  
-</figure+| Total Blocking Time | 10ms | 20ms |  
 +| Largest Contentful Paint | 2.8s | 2.0s |  
 +| Cumulative Layout Shift | 0.002s | 0 |  
 +</table
 +</WRAP>
  
  